A breathable membrane is applied before the build is slatted, followed by the installation of composite cladding on the visible elevations.
Pre-fabricated modular panels are manufactured using pressure-treated C24 timber frames, fully insulated with rigid boards.
Each build begins with the precision welding of a raised steel subframe, featuring evenly spaced steel box-section posts that act as anchor points for lifting.